Petroleum Systems Installation And Its Uses And Applications

By Virginia Long


The province of Nova Scotia has vast oil and gas resources, both onshore and offshore. Estimates of proven oil reserves in offshore NS number more than one hundred and twenty trillion cubic feet of natural gas and eight billion barrels of oil. That excites considerable prospects among contractors and investors should they think about Petroleum Systems Installation Nova Scotia.

A petroleum system is made up of an active source rock enclosing oil and gas accumulations. Petroleum may be found in various states, from hydrocarbon gas, liquid fuel, and solid condensates like bitumen. An appropriate relative timing of both elements and processes is indispensable in order for this reservoir to be functional, which is why it is called a system.

This hydrocarbon system is composed of an active source, a reservoir, a seal, and an overburden rock. Processes involved include the trap formation, the generation of petroleum, and then their accumulation. If one part and a necessary process are even just a bit off, the system will not work at all.

The application of petroleum systems ranges from research, resource evaluation, and exploration. Exploration is done in regions in which reserves have been proven to exist or has a high likelihood of existing. This can be readily identified by geophysicists and mining engineers by singling out the places where these unique elements and processes are known to occur or have a reasonable probability to occur. In this sense, there are three levels of certainty, known, hypothetical, and speculative. Known means the place is a positive source of oil, rock or gas. Hypothetical relies mainly on geochemical evidence while speculative relies on geophysical evidence.

A caveat to keep in mind, though. Working with petroleum and its derivatives and products is a risk riddled task. It is flammable, combustible, and toxic. It is just as well that the industry has accordingly evolved in order to manage the inevitable risks associated with the job.

No matter the precautions, though, the proclivity to system failures is always impending. In the industry, only exceptional occurrences should actuate this happening, such as natural mishaps and setbacks. It is unpardonable when caused by poor workmanship. Excellent engineers and installers always make it a prime consideration to detect leaks and product loss at the earliest time possible. Materials like pipes and steel tanks should be carefully selected to make sure that they are sturdy and effective.

Before the installation is done, a site analysis should be rendered. This includes the soils properties to ensure that it would be stable during the excavation. Another is the degree of environmental risk on the site and other such practicalities. During post installation, the contractors should conduct leak monitoring, leak testing, and pressure tests for new tanks.

Another consideration that should be taken into account is personnel and public. There are all the paperwork, from permits and standards and regulations that should be acquired from the proper authorities. Other requirements to be complied with include detailed drawings of the site that outline all its components and other particularities. These particularities include the locations and dimensions of materials like tanks, pipes, pumps, and electrical cables.

The contractor should make it top priority to ensure that all the hired personnel have the training, qualifications, and experience that would make sure that they do their job safely and competently. It goes without saying that this is a responsible job, unpardonable when done wrong. All the necessary precautions that would ensure the streamlined operations of the site and the safety of its constituents and the environment should be taken and made a top priority.